HYDROLOGICAL DESIGN OF FOREBAY TANK


   

Legend

To be filled by user
Output


        
DESIGN DISCHARGE
3 MINUTES DESIGN DISCHARGE
MAXIMUM WIDTH AT THE END OF HOPPER
MINIMUM WIDTH AT THE START OF HOPPER
AVERAGE WIDTH OF THE HOPPER
LENGTH OF THE HOPPERED PORTION
AVERAGE DEPTH OF THE HOPPER
STORAGE CAPACITY OF THE HOPPER
DIA OF THE PENSTOCK CHAMBER
EFFECTIVE STORAGE DEPTH OF THE TANK
STORAGE CAPACITY OF THE TANK
TOTAL STORAGE CAPACITY OF THE FOREBAY TANK